Table of Content WHAT’S IN THE BOX? ..................... 4 \INSTALLATION ........................ 5 Step 1: Choose a suitable site to install the toilet .................. 5 Step 2: Installing the vent pipe & liquid drain ..................6 Step 3: Constructing the liquid drain trench ................... 9 Step 4: Powering the fan .........................
WHAT’S IN THE BOX? Please check the packing slip to ensure everything has been delivered. If anything is missing, please notify your supplier immediately. Items you will need to complete your installation: 100mm (DWV) PVC Pipe (ventilation): Enough length/meters to rise 600mm above the roof line. N.B.
INSTALLATION Step 1: Choose a suitable site to install the toilet The location of the toilet must have both: Easy access to connect the fan system to a permanent vent pipe up the outside of the structure. The vent pipe from the toilet exits horizontally through the wall behind the toilet. An elevated starting point for liquid to flow by gravity from the toilet down into a liquid absorption trench which is to be dug outside the toilet room.
Step 2: Installing the vent pipe & liquid drain After selecting the toilet’s location, fit the Wallace Grommet to the back of the fibreglass shell. Push Wallace the shell flush against the wall (in the correct position Grommet & alignment). Mark a circle on the wall through the Wallace Grommet &...
Page 7
Wall Insert the 50mm PVC pipe from the wall into the Shell through the Wallace Grommet and push Shell to its chosen position. If Wallace 50mm PVC the PVC pipe protrudes too far Grommet Pipe into the shell [fouling the 20L Shell bin], mark &...
Page 8
PVC pipe components, except the push on cap at the base of the ‘T’ piece (i.e. the Moisture Trap), should be glued together using Plumbers PVC glue. Connect the supplied Sewer Vent Cap to the top of the vent pipe, and then the bottom of the vent pipe into the moisture trap.
Step 3: Constructing the liquid drain trench Wall Place the plain end of the 19mm Liquid Drain Hose through the small hole in the rear of the fibre- glass toilet shell. Feed the hose through until the liquid drain valve connection side is resting just on the inside of the shell near the Liquid Drain Hose...
Step 4: Powering the fan Mains Power A 240/12 volt regulated transformer is included to run the fan from mains power. Connect the fans to the transformer as follows: We recommend a spare fan is kept on hand at all times, particularly after a year of use. Go to Ecoflo Online Store or call 1300 138 182 for replacement or spare fans.
Step 5: Assembling the collection chamber Place the ‘Bio Bag’ into the 20Ltr bin supplied (no lid) & place in the space provided within the Shell under the Lid’s waste chute. Gently lift the Fibreglass Lid from the front & connect the liquid drain hose using the quick click connection supplied, directly to the base of the urine diverter at the front of the lid.
EXCHANGING THE BIO BAG The Bio Bag will need to be changed on a regular basis. The rate of filling will depend on the number of users. When the bag becomes approximately 70% full, you will need to replace it with a new Bio Bag by following these instructions.
COMPOSTING ACCELERATORS Whilst Nature Loo users report successful composting without the use of any additives, we strongly recommend the use of the following in order to optimise composting, particularly when the toilet is in permanent use by more than two people.
1300 138 182. Nature Loo toilets have proven themselves to be one of the easiest systems to manage. However, being a natural process, reliant on a number of factors beyond our control, it can occasionally need some help to maintain an appropriate balance.
PRODUCT & COMPONENT WARRANTY Ecoflo will furnish new parts to a customer whose toilet fails within the allotted warranty pe- riod for the particular component, provided that our inspection shows such failure is due to defective material or workmanship. Any part supplied is warranted for the balance of the original warranty period.