5
Confirm that "0 Errors" and "0
Warnings" are displayed in the
Build Tab Page.
6
Select Online from the
Controller Menu.
7
Select Synchronization from
the Controller Menu.
8
The Synchronization Dialog Box
is displayed.
Confirm that the data to transfer
(NJ501 in the right dialog box) is
selected. Then, click the
Transfer To Controller Button.
*After executing the Transfer To
Controller, the Sysmac Studio
data is transferred to the
Controller and the data is
compared.
7.EtherCAT Connection Procedure
21