Prepare Cutout/Cabinet Opening

1.
On the cutout floor, find and mark the centerline.
2.
Place the bottom duct in the opening, with the flange resting
against the bottom front facing of the opening.
A. Cutout floor
B. Centerline
C. Bottom duct
3. Align the center arrows on the bottom duct with the centerline
drawn in Step 1 above.
A. Bottom duct
B. Center arrows, aligned with centerline
4. Mark the three mounting holes through the bottom duct onto
the cutout floor.
A. Short screws (3)
B. Bottom duct mounting holes
Installation Instructions
D. Bottom duct flange
E. Front facing
5. Using a 7/64" drill bit, drill pilot holes into the three hole marks
shown in the figure above.
6. Realign and install the bottom duct with three short screws.
7. Using a 7/64" drill bit, drill pilot holes through the four bottom
duct flange mounting holes on the bottom front facing of the
cutout/cabinet opening.

Install the Microwave Oven

1. Carefully return microwave oven to its upright position.
2. Position microwave oven near cutout opening.
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death, fire, or electrical
shock.
3. Plug in microwave oven.
4. Align the rails with the rail guides on the bottom duct.
A. Rail guides
B. Rails
EN-4
A. Bottom duct flange
B. Mounting holes
WARNING
Electrical Shock Hazard