4. Operation

This section describes the operation of the MBP, using the operation of the 1+1 Parallel MBP
as an example.

4.1 Wiring of detection cable

Notes:
Refer to section 3 to complete the AC connection of the UPS and MBP.
Refer to the UPS user manual or EBM quick start guide to complete the EBM
connection
Refer to the UPS user manual for the connection of the 'parallel cable' between
multiple UPS
Set up the system's detection loop following the steps below:
MBP detection: connect the MBP to UPS1 via the 'MBP Detection cable', included
1.
with the MBP
EBM 1 detection: connect EBM 1 of UPS 1 to the MBP via the 'EBM Detection
2.
cable', included in the EBM box
EBM 2 detection: connect EBM 1 of UPS 2 to the MBP via the 'EBM Detection
3.
cable', included in the EBM box
Note: If the paralleled UPS system is used for redundancy, the Neutral switch needs to be kept
at the 'ON' position when any of the UPS is removed.