Installation sequence
Siting the Vitocell
(cont.)
2. At heating water flow temperatures above 95 °C,
remove the pipe collars from the pipe outlets (col-
lars have l.h. threads).
3. If no immersion heater is installed, seal in the front
female connection with the plug supplied. Fit the
cover.
Connecting the equipotential bonding
Connect the equipotential bonding in accordance with
the requirements stipulated by your local power supply
utility and VDE [or local] regulations.
Thermal insulation on the Vitocell without Vitotrans
Fitting the lower thermal insulation mat
1.
Fig. 7
Position and level the cylinder.
12
4. Affix the type plate supplied to the back of the
heating water buffer cylinder.
Connect the equipotential bonding in accordance
c
with the requirements stipulated by your local power
supply utility and current SEV regulations.
2.
!
Please note
The thermal insulation must not come into con-
tact with naked flames.
Exercise caution when welding and brazing.