Yearly Checklist - Eclipse ExtensoJet EJ025 Installation Manual

Table of Contents

Advertisement

y
C
early
heCklist
Eclipse ExtensoJet v2 Installation Guide No. 230, 9/17/2008
1.
Inspect flame-sensing devices for good condition and
cleanliness.
2.
Check for proper inlet air/gas ratios.
3.
Test all the alarm systems for proper signals.
4.
Check ignition spark plugs and check proper gap.
5.
Check valve motors and control valves for free, smooth action
and adjustment.
6.
Check for proper operation of the ventilating equipment.
7.
Test the interlock sequence of all safety equipment; manually
make each interlock fail, noting that related equipment closes
or stops as specified by the manufacturer.
8.
Test flame monitoring control system by manually shutting off
gas to burner.
9.
Test main fuel hand-valves for operation.
10.
Clean or replace the combustion air blower filter.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Extensojet ej075

Table of Contents