Cisco Nexus 3400 Series Hardware Installation Manual page 22

Table of Contents

Advertisement

Installing the Switch Using the NXK-ACC-KIT-1RU Rack-Mount Kit
b) Align the two rear rack-mount guides on either side of the switch with the slider rails installed in the rack. Slide the
rack-mount guides onto the slider rails, and then gently slide the switch all the way into the rack until the front
rack-mount brackets come in contact with two rack or cabinet posts.
c) Holding the chassis level, insert screws (12-24 or 10-32, depending on the rack type) in each of the two front rack-mount
brackets (using a total of six screws) and into the cage nuts or threaded holes in the vertical rack-mounting rails (see
the following figure).
d) Tighten the 10-32 screws to 20 in-lb (2.26 N·m) or tighten the 12-24 screws to 30 in-lb (3.39 N·m).
Step 5
If you attached a grounding wire to the chassis grounding pad, connect the other end of the wire to the facility ground.
Cisco Nexus 3400 Hardware Installation Guide
14
Installing the Chassis

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 34180ycNexus 3464c

Table of Contents