NFN Gateway Hardware Installation

2.4 NFN Gateway Hardware Installation
Step 1. Install NFN Gateway PC board onto the mounting plate.
Step 2. Install power supply onto the mounting plate.
Step 3. Install PNET-1 onto the mounting plate.
Step 4. Install the mounting plate onto the CHS-4L chassis that is already installed in the
Step 5. Ground the PNET-1.
Step 6. You are now ready to perform the
NFN Gateway Installation & Operation Manual - P/N: 52306:Rev: D 06/01/07
CAB3/CAB-4 cabinet.