Installation Procedure

Step 14 Performing the final check

To complete the installation, perform the following checks and tests to ensure that the air conditioner operates correctly.
1
Check the following:
• Strength of the installation site
• Tightness of pipe connection to detect gas leak
• Electric wiring connection
• Heat-resistant insulation of the pipe
• Drainage
• Grounding conductor connection
• Correct operation (follow the steps below)
2
Press the
button and check the following:
• The indicator on the indoor unit lights up.
• The airflow blade opens and the fan gears up for operation.
3
Press any button and check the following:
• The appropriate indicator lights up and the air conditioner operates according to the selected mode or function.
4
Press the
button and check the following:
• The airflow blades work properly.

Step 15 Providing information for user

After finishing the installation of the air conditioner, you should explain the following to the user. Refer to appropriate
pages in the user & installation manual.
1
How to start and stop the air conditioner
2
How to select the modes and functions
3
How to adjust the temperature and fan speed
4
How to adjust the airflow direction
5
How to set the timers
6
How to clean and replace the filters
NOTE
• When you complete the installation successfully, hand over the user & installation manual to the user for storage in a
handy and safe place.
30 English