6.2 General Information regarding Commissioning

When configuration has been completed, the following steps must be taken to put the
PRB into operation:
1.
Set all DIP switches to the position according the desired additional functions
2.
Install the PRB
3.
Connect the supply voltage and signalling contacts
4.
Connect the Power Rail
5.
Connect the RS 485 bus cable with preassembled bus connector
Fig. 17: Front view of the Power Rail Booster.