Start-Up - Siemens SIMOVERT MASTERDRIVE SIMOLINK-Board Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

SLB - SIMOLINK Board
6

Start-up

NOTE
Siemens AG 6SE7087-6NX84-0FJ0
SIMOVERT MASTERDRIVES
08.2000
After installation of the SLB optional board has been completed, an automatic
self-test is carried out when the basic unit (converter/inverter) is powered up.
After this, the new board in the basic unit must be provided with a bus address.
Please refer to the documentation on the basic unit for further details.
Please refer to the documentation of the respective basic unit regarding
instructions for the quick method of parameterization.
Operating Instructions
Start-up
6-1

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents