Commissioning; Commissioning The System; Storage In Case Of A Voltage Breakdown; Configuration - TCS FBI4500-0100 Product Information

Ptz camera interface
Table of Contents

Advertisement

Commissioning the system

 Install the devices of the system voltage-free and completely.
 The PTZ camera interface is to be connected to the TCS:BUS
nection diagram.
 Check the a-, b- and P-wire against each other for short-circuits.
 Connect the PTZ camera according to the connection diagram.
 Switch ON the mains voltage.
The PTZ camera interface is ready for operation.

Storage in case of a voltage breakdown

The data, stored on the EEPROM storage which is integrated into the micro controller is
still available even after a voltage breakdown.

Presettings ex works

The device is equipped with an EEPROM which stores the following device settings ex
works:
AS-address camera 1
Control function for moving to prepositions
Second AS-address for moving to preposition 2 camera 2
Automatic Stop protocol
Camera address
Type of PTZ protocol to control the camera
Baud rate
Function
Video level
Allocate camera AS-address for moving to preposition 1
Train / delete preposition of the connected camera
Allocate control function numbers to each preposition
Allocate 2nd AS-address for moving to preposition 2
Allocate control function number for topstitching between the preposi-
tions
Determine PTZ protocol type (match with the camera type)
Activate / deactivate the sending of the automatic stop protocol, when
activating: set delay
OSD camera menu
TCS TürControlSysteme AG  TCS Hotline: +49 (0) 41 94 / 98 81 188
FAX: +49 (0) 41 94 / 98 81 29  Mail: hotline@tcsag.de
10

Commissioning

Configuration

Configuration options

®
according to the con-
0
239
deactivated
deactivated
1
Pelco D
2400 Bd
configo
Manual
version 1.7.x
x
-
-
-
-
-
-
-
-
Subject to technical changes.
PI_FBI4500-0100.doc
11/2012
TM
-
x
x
x
x
x
x
x
x
2A

Advertisement

Table of Contents
loading

Table of Contents