general information
EN
1.3
installation overview
1
5
9
3
10
4
2
Non-combustible
board
7
6
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Install rough framing (refer to "rough framing" section).
3. Install nailing tabs and standoff assembly (refer to "nailing tab installation" and "standoff assembly" sections).
4. Place the appliance in its fi nal position.
5. Install appliance venting (refer to "venting installation" section).
6. Install all electrical wirings (refer to "electrical information" section).
7. Install gas lines (refer to "gas installation" section).
8. Test appliance.
9. Complete framing (refer to "fi nish framing - typical" or "fi nish framing - recess" sections).
10. Finishing (refer to "fi nishing" section).
7