Download Print this page

Kohler VOLUTE K-20610T Installation Instructions page 4

Freestanding bath

Advertisement

3. Wood base installation and drainage pipe insertion: 4
people should stand still and raise the cast iron while
another person places the white wood base or gilded
wood base directly beneath the bathtub. Insert the
drainage pipe pulled from the drainage into the
drainage hole of the bathroom and quickly seal it with
silicone. The other 4 people should slowly put down
the bathtub and prevent the bathtub from falling and
damaging the wood base. Fit the bathtub on the
wood base.
4. Overflow plate installation: The 4 people should
stand still and lift the bathtub slightly to place the
positioning pin of the U-shape overflow plate into the
positioning hole on the bottom of the bathtub. Lower
the bathtub gently and just an M6 screw to fasten the
overflow plate to the bathtub.
5. Handrail installation: Open the bathtub handrail
installation screws pack 1329702. Insert the 1329706
rivet into the handrail hole. Place the 1329705 spring
washer on the 1329703 hexagon socket screw. Use
the 1329707 hexagon socket wrench to fasten the
countersunk head screw onto handrail 1148886.
(Make sure the screw tightens the 1329705 spring
washer to prevent handrail from becoming loose).
Finally, insert the plastic lid 1329704 into the handrail.
(Attention: Please make sure the screw is tightened
and the handrail is not loose. If maintenance is
required after the plastic lid is inserted, please use a
spare plastic lid.
1315528-T01-B
1315528-T01-B
Screw Hole on Bathtub
See Detail A
A
-4-
3.
4.
:4
M6
Lock Bracket on Bathtub with Screw
Insert Pin Into Hole
5.
K-20610T-GR/K-20379T-GR
1329706
1329703
1148886
1329705
1329704
1148886
Handail
1329705
Spring Washers
Detail
4
4
1329702
1329705
1329707
1329706 Riveting
1329704 Plastic Cover
1329703
Hexagon Socxet Screws
A
U

Advertisement

loading

This manual is also suitable for:

Volute k-20610t-grVolute k-20379tVolute k-20379t-gr