Installation sequence
Installing and aligning the Vitovalor PT2
(cont.)
Aligning the gas condensing and fuel cell module at the installation site
4x
Fig. 17
Fitting accessories
Check before final siting: Are all of the accessories fit-
ted, that are to be mounted from the back of the boiler
(e.g. connection set)?
26