Model GT 1400
Folding Door System
**
With Magnum 4A Control**
Mechanical Installa on Manual
DN 0321
WARNING
• Turn OFF all power to the Automa c Door if a Safety System is not working.
• Instruct the Owner to keep all power turned OFF un l correc ve ac on can be achieved by a NABCO
trained technician. Failure to follow these prac ces may result in serious consequences.
• NEVER leave a Door opera ng without all Safety detec on systems opera onal.
Part #15-9324
Rev. 11/26/14

Advertisement

Table of Contents
loading

Summary of Contents for Nabco GT 1400

  • Page 1 • Turn OFF all power to the Automa c Door if a Safety System is not working. • Instruct the Owner to keep all power turned OFF un l correc ve ac on can be achieved by a NABCO trained technician. Failure to follow these prac ces may result in serious consequences.
  • Page 2: Table Of Contents

    1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 Table of Contents Warning Labels ..............iii General Safety Recommenda ons .
  • Page 3 www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 CHAPTER 6: INSTALL THE DOOR PANEL ........6 21 CHAPTER 7: TROUBLESHOOTING .
  • Page 4: Warning Labels

    www.NabcoEntrances.com 1400 Folding Door System Rev. 11-26-14 Part #15-9324 WARNING LABELS Warning labels are universal and used to alert an individual of potential harm to one’s self or to others. The following warning labels are listed in a hierarchy order that de ines the most potential danger irst, and the least potential danger last.
  • Page 5: General Safety Recommenda Ons

    These panels are designed to be assembled with tempered glass. Any sharp objects that come in contact with glass may cause the glass to sha er. NABCO Entrances is not responsible for glass that is broken during the installa on of this Unit.
  • Page 6: Chapter 1: Scope

    The owner should follow these instructions to determine whether the door is operating properly and should immediately call for service if there is any malfunction. All installation changes and adjustments must be made by quali ied, NABCO trained technicians. Note:  As an Option, the GT-1400 Fold door can be certi ied to have a Hurricane High Impact Compliant...
  • Page 7: Chapter 2: Getting Started

    www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 CHAPTER 2: GETTING STARTED GT-1400 Fold Door System is manufactured out of aluminum, and comes with the following: ► Installation Con igurations: • Installed within Rough Opening of Building • Door Panel assemblies always fold toward the direction of breakout. ►...
  • Page 8: Sec On 2B: Handing

    Strike end of any Folding door for Breakout to occur. Sec on 2g: Associated Manuals Part Numbers Note:  Associated Manuals can be downloaded from the NABCO web site at: www.nabcoentrances.com. ► Swing Door Wiring and Adjustment Magnum 4A Control; P/N 15-10682 Ge ng Started...
  • Page 9: Chapter 3: Install The Door Frame

    www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 CHAPTER 3: INSTALL THE DOOR FRAME Sec on 3a: Prepare the Rough Opening Note:  Make allowances for tile or other existing materials that may change the loor height. 1. Ensure the Rough Opening is the correct size. Please see Figure 2-2. The width of the Rough Opening should equal: ...
  • Page 10 1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 Swing Out 90 Guide Channel Dress Plate Magne c Latches Rocker Switch DN 0837 Figure 3-2  Swing Out Channel Guides 90 Degrees 5.  Remove #10-24 x 3/4 inch screws used to secure the Dress Plate. Please see Figure 3-3. Save screws for reinstallation.
  • Page 11: Sec On 3C: Secure Header To Jamb Tubes

    DN 0327 Jamb Tube Figure 3-5  Secure Header to Jamb Tubes Sec on 3d: Anchor Placement Anchors are not provided by NABCO.  Anchors must be appropriate for the type of structure being fastened to.  Ensure anchor heads to not come in contact with edges of glass to prevent breakage.
  • Page 12 1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 installing into the opening. Note:  Do not overtighten anchors to prevent deforming Jamb tubes.  3.c.a: Secure Jamb Tubes to Rough Opening 36” max 48” max 48” max DN 0832 Figure 3-6  Anchor Placement 5. Lift to position assembled Frame into the rough opening.
  • Page 13 www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324  3.c.b: Secure Header to Rough Opening Verify that each Motor is connected to the Magnum 4A Control before inserting Pin DANGER or 1/8" Allen Wrench into Lovejoy Coupling Access Hole via the Access Hole on the Magnum 4A Control.
  • Page 14 1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 4. With both Guide Channels locked into the 90 degree open position, secure Header to the rough opening: Standard Fold Door  • Use 1/4 inch diameter anchors with a maximum 48 inches on center. First anchor maximum is 36 inches from each end of the Header.
  • Page 15: Chapter 4: 110 Vac General Wiring

    www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 CHAPTER 4: 110 VAC GENERAL WIRING The Magnum 4A Control Bracket has (3) 7/8 inch Holes that can be used to secure a Cable Clamp or Conduit. Please see Figure 4-1. 7/8" Hole 7/8" Hole DN 0841 Figure 4-1 ...
  • Page 16 1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14  4.a.b: Main Power Connec ons - Bi-Fold - 2 Controls ⑤ ⑥ C 2 6 D 1 0 M A G N U M 4 A STOP OPEN BCHK TDAS TDPG LCHK CLOSE C A P A C I T O R R E L A Y R E L A Y...
  • Page 17: Chapter 5: Install The Folding Door

    Sec on 5a: Install the Bo om Pivot (Floor Por on) 1. Obtain the Bottom Pivot Parts Box (P/N 22-9643) provided by NABCO. (2) 1/4 - 20 round head screws provided by the Pivot Manufacturer are not required. 2. Obtain the Bottom Pivot (Floor Portion) from the Parts Box.
  • Page 18: Sec On 5C: Secure Spindle Drive Bar To Folding Door

    Sec on 5c: Secure Spindle Drive Bar to Folding Door Note:  The Drive Bar is installed to the Channel Guide at the NABCO Factory for shipping purposes only and must be removed from the Channel Guide before the Folding Door can be installed.
  • Page 19: Sec On 5E: Secure Guide Channel To Folding Door

    www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 1/4-20 x 2” Phillips Head Screw 1/4” Star Washer DN 0845 Figure 5-5  Remove Screws and Star Washers 3. Lift the Folding Door from the lat surface. Please see Figure 5-6. Keep Door Panels loosely folded. 4. Tilt the Folding Door to slide the Spindle Drive Bar into the Pivot end of Top Web.
  • Page 20 Please see Figure 5-9. 8. Go to the Spindle Drive Bar located inside the Top Web, at the Pivot end. 9. Obtain (1) Split Plastic Bushing that was provided by NABCO. 10. Push the Split Plastic Bushing around the Spindle between the Guide Channel and Spindle Drive Bar.
  • Page 21: Sec On 5F: Adjust Folding Door

    Sec on 5f: Adjust Folding Door Note:  Each Push Rod has been pre-installed at the NABCO Factory to ensure the Folding door will fully close under normal operation. However, after installation adjustments may be necessary. 1. Go to the Push Rod that needs to be adjusted. Loosen both Hex Locknuts.
  • Page 22: Chapter 6: Install The Door Panel 6

    CHAPTER 6: INSTALL THE DOOR PANEL 3.1 Install the (Floor Por on) of Bo om Pivot 1. Obtain the Bottom Pivot Parts Box (P/N 22-9643) provided by NABCO. (2) 1/4 - 20 round head screws provided by the Pivot Manufacturer are not required. 2. Obtain the Bottom Pivot (Floor Portion) from the Parts Box.
  • Page 23 3.3 Secure Spindle Drive Bar to Folding Door Note:  The Drive Bar is installed to the Channel Guide at the NABCO Factory for shipping purposes only and must be removed from the Channel Guide before the Folding Door can be installed.
  • Page 24 1400 Folding Door System w/Opus Control www.NabcoEntrances.com Part #15-9324 Rev. 7-29-15 2. Lift the Folding Door from the lat surface. Keep Door Panels loosely folded. 3. Tilt the Folding Door to slide the Spindle Drive Bar into the Pivot end of Top Web. The Spindle Drive Bar can be pushed up toward the Header to allow clearance.
  • Page 25 5. Push on the Bar located in the middle of Bi-Fold Panels to manually fold open the Door. 6. Go to the Spindle Drive Bar located inside the Top Web, at the Pivot end. 7. Obtain (1) Split Plastic Bushing that was provided by NABCO. 8. Push the Split Plastic Bushing around the Spindle between the Guide Channel and Spindle Drive Bar.
  • Page 26: Chapter 7: Troubleshooting 7

    1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 CHAPTER 7: TROUBLESHOOTING Magnum 4A Troubleshoo ng Chart Problem Solu on Operator does not func on Cause Fuse 1 (F1) may be blown. Resolu on Replace Fuse. Cause Fuse installed on Brake Module may be blown. Resolu on Test and Replace Fuse.
  • Page 27: Part #15-9324 Rev. 11

    www.NabcoEntrances.com 1400 Fold Door System Rev. 11-26-14 Part #15-9324 Magnum 4A Troubleshoo ng Chart Problem Solu on Fuse 1 (F1) or Fuse 2 (F2) Cause Current consump on overload. blows when OPEN Resolu on 1. Go to Terminal Block. Poten ometer is ac vated 2.
  • Page 28 1400 Fold Door System www.NabcoEntrances.com Part #15-9324 Rev. 11-26-14 Magnum 4A Troubleshoo ng Chart Problem Solu on Sensor, safety mats, Cause Connec on of Sensor to Wiring harness to: “Safety w/Lockout” not holding beams, or all other “Con nuous Safety”. accessories mounted on Resolu on 1.