Connect Shift Rod; Assemble Chute And Rotator; Assemble Split Rod - Snapper L1226E Operator's Manual

Large frame snowthrower
Hide thumbs Also See for L1226E:
Table of Contents

Advertisement

Available languages

Available languages

Assembly

CONNECT SHIFT ROD

1.
Connect shift rod (A, Figure 7) to shift lever (B) and
secure with lock washer (C) and 5/16 lock nut (D).
Tighten lock nut with a 1/2" wrench while preventing
stud (E) from turning with a 7/16" wrench.

ASSEMBLE CHUTE AND ROTATOR

1.
Bring chute from pallet to the left side of snowthrow-
er.
2.
Slide the chute base (A, Figure 8) onto the auger
housing (B).
3.
Slide support tube (C) on the carriage bolts (D).
4.
Thread two 3/8" flange nuts (A, Figure 9) onto car-
riage bolts and tighten with a 9/16" wrench.

ASSEMBLE SPLIT ROD

1.
Take end of split rod (A, Figure 10) that is attached to
top back side of chute assembly and align it to right
side of split rod protruding from dash.
2.
Insert two small carriage bolts (B) into square holes
of split rod.
3.
Install 1/4" lock nuts (C) and tighten hardware with a
7/16" wrench.
D
C
Connect Shift Rod
A
B
Chute and Rotator Assembly
Carriage Bolts
Split Rod Assembly
12
A
B
E
Figure 7
C
D
Figure 8
Figure 9
C
B
B
C
Figure 10
A
A

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents