Connection Details; Collector Union Assembly 2 - Rheem NPT 200 Installation Instructions Manual

Hide thumbs Also See for NPT 200:
Table of Contents

Advertisement

COUPLING COLLECTOR TO COLLECTOR – SCREWED FITTING
Refer to
installation diagrams on pages
page 25.
Seat an 'O' ring (6) into each of the collector connections to be joined.
1.
2.
Fit a collector union (3) to each collector connection of the first solar
collector (17) to receive the second solar collector and screw in the unions
until they seat firmly against their 'O' ring (6). Hand tighten only so the solar
collectors can be shifted and centred.
3.
Place the collector unions (3) into the collector connections on the second
solar collector and screw in the unions until they seat firmly against their
'O' ring (6). Hand tighten only so the solar collectors can be shifted and
centred.
4.
Repeat steps 1 and 2 for a third and fourth solar collector (if installed).
5.
After the solar collectors are centred on the collector rail(s), tighten each
collector union (3) with a spanner applying medium pressure.
Solar Collector
DETAIL A – COLLECTOR UNION ASSEMBLY – SCREWED FITTING

CONNECTION DETAILS

P/No: 33-0171
O-Ring 25mm ID x 3.2 Thk
P/No: 33-0695
Collector Union
DETAIL B
CONNECTOR
(BETWEEN COLLECTORS)
(LOLINE AND HILINE)
31
and
32 for position and
25
Detail A
on
Solar Collector
O-
Solar C

Advertisement

Table of Contents
loading

Table of Contents