Installing The Switch In An Equipment Rack - Avaya WLAN 8100 Series Regulatory Information

Hide thumbs Also See for WLAN 8100 Series:
Table of Contents

Advertisement

English
Attach the rubber feet at the marked
locations.
Allow at least 2 inches (5.1 cm) on each side for proper ventilation and at least 5 inches (12.7
cm) at the back for power cord clearance.

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch.
• WLAN Controller 8100 Series models require one rack unit (1.75 inches, 44.45
millimeters)
• The rack must be bolted to the floor, and braced if necessary.
• The rack must be grounded to the same grounding electrode used by the power service
in the area. The ground path must be permanent and must not exceed 1 ohm of resistance
from the rack to the grounding electrode.
The following figures illustrate installing the switch in a rack.
14
Avaya WLAN 8100 Regulatory Information - WLAN Controller 8100 Series
Set the switch on a table or shelf.
Comments? infodev@avaya.com
September 2012

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wc 8180

Table of Contents