Ceiling Dimension And Hanging Bolt Location - LG AMNW Series Installation Manual

Table of Contents

Advertisement

INSTALLATION
8

Ceiling dimension and hanging bolt location

Installation of Unit
Install the unit above the ceiling correctly.
POSITION OF SUSPENSION BOLT
- Apply a joint-canvas between the unit and duct to absorb unnecessary vibration.
- Apply a filter Accessory at air return hole.
<TYPE A>
E
D
C
J
A
B
H
Capacity(kBtu/h)
Dimension
Model
A
733 (28-17/20)
B
772 (30-2/5)
C
628 (24-18/25)
D
700 (27-11/20)
E
36 (1-2/5)
F
190 (7-12/25)
G
20 (25/32)
H
660 (25-49/50)
I
155 (6-1/10)
J
700 (27-11/20)
h Install the unit leaning to a drainage hole side as a figure for easy water drainage.
G
Drainage hole
9 k
12/18 k
AMNW**GL*A*
(TYPE A)
933 (36-37/50)
972 (38-13/50)
628 (24-18/25)
700 (27-11/20)
36 (1-2/5)
190 (7-12/25)
20 (25/32)
860 (33-17/20)
155 (6-1/10)
900 (35-11/25)
<TYPE B/C>
A
B
filter
body
Joint canvas
(G)
Main duct
H
Drainage hole
Canvas
Duct
Intake
Duct
Air Intake
Ceiling
Port
Board
Inspection
Port
24 k / 36 k
24 k
AMNW**GBGA0
(TYPE B)
1,232 (48-1/2)
1,232 (48.5)
1,182 (46-17/32)
1,182 (46.5)
355 (13-31/32)
355 (14)
45.5 (1-25/32)
45.5 (1.8)
450 (17-23/32)
450 (17.7)
30 (1-3/16)
30 (1.2)
87 (3-7/16)
87 (3.4)
830 (32-11/16)
830 (32.7)
186 (7-5/16)
186 (7.3)
298 (11-23/32)
298 (11.7)
Indoor Unit
Ceiling
Discharge
Duct
Air Discharge
Port
Ceiling Board
[Unit:mm(inch)]
36 k
ABNH**GGLA2
(TYPE C)
1,290(50.8)
1,230(48.4)
477(18.8)
56(2.2)
590(23.2)
30(1.2)
120(4.7)
1,006(39.6)
294(11.6)
380(15)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents