5
QQ
3 7 63 1515 0
Removal of DVD MECHA Assy Parts
NOTE
Disassemble only the DVD MECHA Assy parts listed here.
Minute adjustments are needed if the disassembly is done.
If the repair is needed except listed parts, replace the DVD
MECHA Assy.
1: TRAY (Refer to Fig. 1-A)
1. Set the Tray opened. (Refer to the DISC REMOVAL
METHOD AT NO POWER SUPPLY)
2. Unlock the 2 supports 1 and draw it while sagging the
Tray.
Push to Sag
Tray
NOTE
TE
1. In case of the Tray installation, install them as the circled
L 13942296513
section of Fig. 1-B so that the each markers are met.
2: TRAVERSE ASSY (Refer to Fig. 2-A)
1. Remove the screw 1.
2. Unlock the 2 supports 2.
3. Remove the Insulator (R) from the LOADER SUB Assy.
4. Remove the TRAVERSE Assy.
LOADER SUB Assy
www
.
TRAVERSE Assy
• Screw Torque: 2.0 ± 0.3 kgf•cm
5
http://www.xiaoyu163.com
6
LOADER Assy
1
Push to Sag
LOADER Assy
Tray
1
2
2
x
ao
u163
y
Insulator (R)
i
6
http://www.xiaoyu163.com
2 9
8
NOTE
1. In case of the TRAVERSE Assy, install it from (1) to (4)
in order. (Refer to Fig. 2-B)
2. In case of the TRAVERSE Assy installation, hook the
wire on the LOADER Assy as shown Fig. 2-C.
Fig. 1-A
Q Q
3
6 7
1 3
3: LOADING MOTOR PCB Assy / LOADING BELT
(Refer to Fig. 3-A)
1. Remove the Loading Belt.
Fig. 1-B
2. Remove the screw 1.
3. Remove the LOADING MOTOR PCB Assy.
4. Remove the 2 screws 2.
5. Remove the Loading Motor.
6. Remove the Gear Pulley.
Loading Belt
.
• Screw Torque: 2.5 ± 0.3 kgf•cm (Screw 1)
• Screw Torque: 1.0 ± 0.3 kgf•cm (Screw 2)
Fig. 2-A
XV-DV575
7
9 4
2 8
LOADER Assy (Bottom Side)
Check Lock
1 5
0 5
8
2 9
9 4
LOADER Assy
Check Hook
2
2
m
Gear Pulley
co
Loading Motor
LOADING MOTOR PCB Assy
1
7
8
9 9
A
B
Rack Loading
Holder Traverse
TRAVERSE Assy
C
Fig. 2-B
2 8
9 9
D
Fig. 2-C
E
LOADING SUB Assy
F
Fig. 3-A
39
8