Maintenance Work To Be Completed Every 24 Months; Maintenance Work To Be Completed Every 48 Months - Parker Zander WVM Series Operating Manual

Adsorption dryer
Table of Contents

Advertisement

► Take the new dewpoint sensor (2) from the box, remove the protective caps
(4, 5) and screw it into the sensor chamber (3).
► Place seal onto sealing face; connect adapter (1) and secure it by tightening
the screw.
► If no other maintenance work is to be carried out: Restart the dryer (see
page 44).
► Place the protective caps (4, 5) onto the old dewpoint sensor and dispose of
it in a proper manner.

Maintenance work to be completed every 24 months

Inspect vacuum pump bearing and replace, if necessary
Caution!
Maintenance work at the vacuum pump may only be carried out by
authorised and suitably qualified technical personnel who have already
successfully completed similar tasks.
Please contact us to arrange a visit by one of our service technicians.
Alternatively, ask us for a training session for the servicing of the vacuum
pump. You will find the telephone number of our customer services
department on page 8.

Maintenance work to be completed every 48 months

To complete the following maintenance tasks, you must dismantle the pipe
bridges and the vessels. We therefore recommend that you carry out these tasks
together.
Note:
In accordance with national regulations, a pressure vessel inspection
may be prescribed to be carried out at regular intervals by an
independent supervisory office.
For an inspection of the pressure vessels, the drying agent must be
removed as described as follows.
When inspecting the pressure vessels, it is recommended to check
the condition of all fittings such as e.g. sieve bottoms and dust
sieves, including gaskets. If necessary, these fittings must be cleaned
or renewed.
In the event of comprehensive maintenance or repair tasks, contact
the manufacturer (see page 8).