Start-up

Warning!
The dryer must be taken into operation by trained personnel only!
Untrained personnel does not have the required knowledge. Such
personnel might cause serious faults.
Note:
You can order the initial commissioning and start-up from the
manufacturer and have your personnel trained by the manufacturer.
For telephone number, see page 8.
Carry out all prescribed tests and checks.
Before start-up, ensure that no tools or other foreign parts have been left
lying in a part of the dryer where they might pose a hazard to the dryer being
started up.

Requirements for initial commissioning

The following conditions must be met for initial commissioning:
All pipelines are free of contamination.
All shut-off valves are closed.
The dryer has been properly set up, wired and connected.
The compressors are ready for operation.
At the outlet side, a compressed air consumer is present, i.e. compressed air
can flow through the dryer.
Operators for the components are available.
Inspection to be carried out prior to commissioning
Ensure that
all pipe, cable and screw connections have been retightened,
none of the lines are worn at edge of the dryer body,
all connections are properly secured,
the electric connections are properly secured and in good condition,
the operator-supplied components such as safety valves and other equipment
holding pressure are not blocked by dirt or paint,
all components of the compressed air system that are under pressure
(valves, hoses, etc.) are free of wear or other defects,
sufficient amounts of required supply media such as steam or cooling water
are available at suitable quality and the respective shut-off valves are open.