: 0.098 N·m (1.0 kgf·cm)
1.4 DISASSEMBLY/ASSEMBLY OF CAMERA SECTION
AND DECK SECTION
1.4.1 Flowchart of disassembly
The following flowchart shows the disassembly of the camera
section and deck section. When assembly of the camera
section and deck section, follow this flowchart in the reverse
order.
<Camera section/Deck section>
1
DSC board assembly
M
2
Zoom unit assembly
M
3
Main board assembly
M
4
OP block assembly
(Incl. CCD board assembly)
M
5
Frame assembly
M
6
Cassette housing assembly
(Only for
SXM930)
M
4
OP block assembly
M
4
CCD board assembly
For details of disassembly of
manner, refer to page 1-12,
"1.5 REPLACEMENT OF
CCD IMAGE SENSOR.
43
(S13)
Fig. C13
1.4.2 Disassembly method
STEP
/LOC
PART
NO.
1
DSC BOARD
ASSEMBLY
2
ZOOM UNIT
ASSEMBLY
3
MAIN BOARD
4
OP BLOCK
ASSEMBLY
5
FRAME ASSEMBLY
6
CASSETTE
HOUSING
ASSEMBLY
List of Abbreviations:
2(S1) = 2 Screws (S1)
4(L1a)=4 Locking Tabs (L1a)
CN=Connector
42
(S13)
11
REMOVAL
Fig.
*UNLOCK/RELEASE/
No.
UNPLUG/UNCLAMP/
UNSOLDER
D1
2(S1), (L1a), (L1b), (L1c)
*CN 1a , 1b
HOLDER (DSC)
D2
3(S2)
*CN 2a
4(S2)
*CN 2a
D3
(S3), (L3a), (L3b)
*CN 3a , 3b , 3c , 3d , 3e
3f , 3g , 3h
D4
2(S4)
CUSHION (OP)
D5
(S5a), 2(S5b), (S5c)
D6
4(S6)
1-9