Conveyor Removal; Conveyor Installation - Meridian TITAN SR2 Operator's Manual

Bulk seed tender
Table of Contents

Advertisement

10.7 CONVEYOR REMOVAL

1. Remove the transport lock and rotate the
conveyor to a convenient position.
2. Lift the trolley lock plates and roll the trolley
away from the slide gates.
3. Attach a suitable lifting device to the lifting
point on the conveyor tube.
4. Disconnect the hydraulic lines from the motor.
Have a container ready to catch any excess oil
that drains from the lines.
5. Remove retaining pin (1) and withdraw lock
pin (2).
6. Slide the conveyor out and set in a safe
location.Protectthehydraulicfittingsfrom
damage and contamination.

10.8 CONVEYOR INSTALLATION

1. Attach a suitable lifting device to the lifting
point on the conveyor tube. Slide the
conveyor into the carriage. Make sure hooks
(3) on the carriage engage rod (4) on the
conveyor.
2. Insert the lock pin and its retaining pin.
3. Connect the hydraulic lines to the motor.
4. Detach the lifting device.
5. Starttheengineandruntheconveyorbriefly.
Check the hydraulic connections for leaks,
and check the hydraulic oil level. Add oil as
needed.
45

Advertisement

Table of Contents
loading

Table of Contents