NOTE: To avoid injury to personnel and damage to equipment or property
when completing the procedures listed in this start-up checklist, use good judg-
ment, follow safe practices, and adhere to the safety considerations/information
as outlined in preceding sections of this Installation Instruction document.
I. PRELIMINARY INFORMATION
Outdoor: Model No.____________________
Serial No. ____________________________
Job name ____________________________
Address ____________________________
Additional Accessories
II. PRE-START-UP
OUTDOOR UNIT
Is there any shipping damage?
If so, where:
Will this damage prevent unit start-up?
Check power supply. does it agree with unit?
Has the ground wire been connected?
Has the circuit protection been sized and installed properly?
Are the power wires to the unit sized and installed properly?
Have compressor holddown bolts been loosened?
CONTROLS
Are thermostat(s) and indoor fan control wiring connections made and checked? (Y/N) ______________
Are all wiring terminals (including main power supply) tight?
Have outdoor unit crankcase heaters been energized for 24 hours?
INDOOR UNIT
Has water been placed in drain pan to confirm proper drainage?
Are proper air filters in place?
Have fan and motor pulleys been checked for proper alignment?
Do the fan belts have proper tension?
PIPING
Has foam shipping block been removed from the TXV (Thermostatic Expansion Valve)?
Are liquid line solenoid valves located at the indoor unit (FAS) or outdoor unit
(FHS) coils as required?
Have leak checks been made at compressors, condensers, indoor coils, TXVs (Thermostatic
Expansion Valves) solenoid valves, filter driers, and fusible plugs with a leak detector?
Locate, repair, and report any leaks.
Have all compressor service valves been fully opened (backseated)?
Are the compressor oil sight glasses showing correct levels?
CHECK VOLTAGE IMBALANCE
Line-to-line volts:
(AB + AC + BC) / 3 = Average voltage = ______________v
Maximum deviation from average voltage = ______________v
Voltage imbalance = 100 x (max deviation)/(average voltage) =
If over 2% voltage imbalance, do not attempt to start system! CALL LOCAL POWER COMPANY FOR ASSISTANCE.
508 01 1603 01

START-UP CHECKLIST

(SPLIT SYSTEMS: FAS UNITS WITH CAS UNITS)
AB ______________v
Specifications are subject to change without notice.
Indoor: Model No. ____________________________
Serial No. _____________________________
Start-up date _____________________________
Technician name ______________________________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
AC ______________v
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
(Y/N) ______________
BC ______________v
CL-1