Vent Terminal And Combustion Air Inlet Hood; Optional Vertical Venting - Bard WG Series Installation Instructions Manual

Wall mounted gas/electric
Table of Contents

Advertisement

10. VENT TERMINAL AND COMBUSTION
AIR INLET HOOD
The vent terminal is shipped in the burner
compartment (see Figure 7). Remove the two shipping
screws and separate the two-piece assembly. Install
the vent terminal by using the four screws provided.
Make sure gasket is in place (see Figure 8). The
combustion air intake hood is factory installed.
Vent terminal must be installed as shown in Figure 8 for proper operation of the heating system.
NOTE: The inner vent hood gasket is designed to stretch over and seal around the combustion
air blower outlet. This is a very critical seal to prevent water and flue products from entering the
unit. Care must be taken to insure this gasket is in place and sealing properly.
CAUTION
FIGURE 8
Vent Terminal and Combustion Air Intake

11. OPTIONAL VERTICAL VENTING

With the optional vertical venting kit (VVK-5), this unit
may be vented vertically through a roof or overhang.
The kit includes a stainless steel transition drain tee,
silicone sealant and drain tubing.
If unit is installed with vertical vent kit, annually
inspect the vent system and drain. Replace any portion
of the vent system that shows signs of deterioration.
Make sure drain is open and free of obstruction.
Manual
2100-587J
Page
17 of 59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wg5s2-aWg4s2-bWg3s2-bWg5s2-bWg3s2-cWg4s2-c ... Show all

Table of Contents