ABB PST Series Installation And Commissioning Manual page 165

Table of Contents

Advertisement

6WDWXV
8QGHUORDG SURWHFWLRQ
Power on
Fault
Protection
2TQV 7PFGTNQCF
4GUGV
/RFNHG URWRU SURWHFWLRQ
Power on
Fault
Protection
2TQV .QEMGF 4QV
4GUGV
+LJK FXUUHQW SURWHFWLRQ
Power on
Fault
Protection
2TQV *KIJ +
4GUGV
3KDVH LPEDODQFH SURWHFWLRQ
Power on
Fault
Protection
2TQV 2JCUG +OD
4GUGV
3KDVH UHYHUVDO SURWHFWLRQ
Power on
Fault
Protection
2TQV 2JCUG 4GX
4GUGV
1SFC132003M0201
3RVVLEOH FDXVH
The motor current is below set
level and time.
$CEM
The motor is running stiff by
some reason.
A damaged bearing or a stucked
load could be possible causes.
$CEM
A fault current, higher than 8
times the softstarter ratings, has
occurred.
$CEM
Unbalance in the phase currents. • Check the main voltage and the motor
$CEM
The phase sequence is not
correct.
$CEM
6ROXWLRQ
• Check and correct the reason for the
underload.
• Check that the settings are according to
the operation conditions.
• Check the bearings of the motor and
load.
• Check that the load is not running stiff.
• Check the circuits including the motor for
any insulation fault phase to phase or
earth fault.
circuit.
• Restart the motor and check the phase
currents
• Change the phase sequence on the line
side to (L1-L2-L3).
&KDSWHU 
7URXEOH VKRRWLQJ
165