Download Print this page

GE Tetra Contour LS Installation Manual page 3

Advertisement

3
Continue attaching all the sections to the remaining
mounting clips, leaving a 3/8 inch (10mm) gap between
sections to allow for expansion or contraction.
Electrical Connections
Must be used with Tetra 24 Volt
Power Supplies. Refer to the Power
Supply Installation Instructions for
more information on the power supply.
WARNING
Risk of electrical shock. Turn power OFF
before inspection, installation or removal.
White with
White ( - )
red stripe (+)
Red (+)
Black ( - )
To power supply
3
Using twist-on wire connectors,
connect the white wire with red
stripe (+) from the LED strip to the
red wire (+) of the power supply.
Connect the white wire (-) from the
LED strip to the black wire (-) of the
power supply.
NOTE: Grounding and bonding
must be done in accordance with
National Electrical Code (Article
600). See power supply instructions.
3/8 in. (10mm) gap
4
To Tetra Contour LS
Black ( - )
Power
supply
1
Run a wire from the power supply to
a section of Tetra Contour LS.
NOTE: Power supply connection
must be contained in an acceptable
UL/NEMA enclosure.
4
Insert wire connectors into weather
box. Fill with electrical grade silicone
and close box.
NOTE: Examples of electrical grade
silicone include GE RTV 6700 Series
Sealant, GE White Blanc RTV 162, Dow
Corning 3145, Dow Corning RTV 748
Plug together all adjacent Tetra Contour LS sections and
tuck wires behind Tetra Contour LS sections or behind
accessory pieces.
Red (+)
2
Cut off the quick connector on
the Tetra Contour LS that you are
connecting to the power supply.
Weather box can be painted
5
Secure the weather box using a
#6 or #8 (M2 or M3) screw.
NOTE: When using twist - on
connectors, weather box is required
for all outdoor electrical connections.

Advertisement

loading