Dynamic Adjustment - Briggs & Stratton E Series Service Information

Ohv vertical shaft engines
Hide thumbs Also See for E Series:
Table of Contents

Advertisement

Control Bracket, Governor Lever, and Governor Spring
Either a fixed speed bracket with a single screw (Figure 8a) or a variable speed bracket with two screws (Figure 8b)
is installed.
Attach the governor spring first to the tab of the fixed or the variable speed bracket, then attach it to the governor
lever from the cylinder side, as shown (Figure 8a or 8b).
Governor Adjustment Procedure
Static Adjustment
1. Loosen the governor nut.
2. Rotate the throttle linkage from idle to wide open throttle. Note the direction of rotation of the governor lever.
3. Rotate the governor shaft in the direction noted until it stops.
4. While holding the linkage and governor shaft, tighten the governor lever nut to the specification provided in this
APSI.

Dynamic Adjustment

1. Start the engine and allow it to warm up at idle for 3-5 minutes.
2. Move the throttle control (if equipped) to high speed. Using a tang bender, adjust the top no load speed by
bending the tang to obtain the equipment manufacturer's top no load speed specification.
3. Verify that all speeds meet specifications before returning the engine to service.
Figure 8a
Spring Color
Blue
Purple
Orange
Yellow
Figure 8b
Top No load Speed
2600 - 2700
2800 - 3200
3200 - 3600
3600 - 4000
Page 7 of 12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

550e series09p700550ex series09p600

Table of Contents