Viessmann Vitodens 200-W B2HA 112 Installation Instructions Manual page 70

Wall-mounted, gas-fired condensing boiler
Hide thumbs Also See for Vitodens 200-W B2HA 112:
Table of Contents

Advertisement

Table of Contents
Safety
Start-up
Service
4
Vitodens 200-W B2HA 112, 150, 399, 530 Service
Safety, Installation and Warranty Instructions................2
About these Service Instructions..................................6
Necessary Tools.........................................................6
.......................................................8
Applicability..............................................................9
Product Information....................................................9
Mechanical Room.....................................................10
Check Power Supply Connection................................11
Start-up Wizard........................................................12
Removing Front Enclosure Panel.................................15
Fill Condensate Trap with Water.................................15
Fill Heating System with Water...................................16
Designating Heating Circuits......................................18
Select Gas Type.......................................................18
Setting High Altitude.................................................19
Pressure Switches.....................................................21
During Each Start-up Cycle........................................22
Set Maximum Input...................................................23
Connections for Leaks...............................................23
Perform Combustion Analysis.....................................23
Remove Burner Assembly..........................................24
Reinstall Burner Assembly..........................................24
Checking the Flue Gas Flapper....................................25
Check Burner Refractory............................................25
Check Condensate Drain.........................................27
Check Functioning of Safety Valves............................29
Check Electrical Connections......................................29
Check Pipes and Fittings for Leaks..............................29
Clock Natural Gas Meter............................................30
Setting....................................................31
2
Page
.8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents