Screed Box/Bead Dispenser Box Actuator; Screed Box Pivot Arm Loading; (Thermolazer 300Tc/Promelt Only) - Graco ThermoLazer 200TC Repair Manual

Pavement marking systems
Hide thumbs Also See for ThermoLazer 200TC:
Table of Contents

Advertisement

Screed Box/Bead Dispenser Box Actuator

3. Reconnect clevis to deployment bar and again
rotate bead box wheel to see if adjustments cause
ThermoLazer to move forward and backwards.
4. Continue to rotate clevis 1/2 turn counterclockwise
until rotating bead box wheel causes ThermoLazer
to move forward and backwards.
5. Lock nut (128) to clevis when final adjustment has
been made.
NOTE: Linkage rod (182): If converting from SmartDie
to SmartDie II, use Die Link Kit 24J714.
Screed Box/Bead
Dispenser Box Actuator
(ThermoLazer 300
If the screed box/bead dispenser box actuator does not
remain in the "down and locked" position, adjust the
3/4-16 lock nut by turning clockwise 1/4 to 1/2 turn or
until the actuator does not freely rotate.
22
78
268
179
128
ti14883a
/ProMelt only)
TC
ti14604a
Screed Box Pivot Arm
Loading
(ThermoLazer 300
Preload screed box pivot arm to ensure gate closes fully
before lifting screed box off the ground. If screed box
leaks when closing and lifting, increase loading.
1. Unhook bottom of box pivot arm spring (199).
2. Move bottom of box pivot arm spring to desired hole
and reconnect. Moving the spring in will decrease
loading, while moving the spring out will increase
loading.
/ProMelt only)
TC
ti14628b
ti14629b
3A1320L

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermolazer 300tcThermolazer promeltThermolazer 200

Table of Contents