Installing The Range Hood - Samsung NK30N7000US Installation Instruction Manual

Hide thumbs Also See for NK30N7000US:
Table of Contents

Advertisement

Installation
STYLE 1 - CUT OPENINGS FOR 3¼" X 10" (8.3 CM X 25.4 CM)
RECTANGULAR VENT SYSTEM
Wall venting
To make a 4" x 10½" (10.2 cm x 26.7 cm) rectangle in the wall:
1. Draw one line 2
" (7.0 cm) and a second line 6
3
4
the underside of the cabinet. Extend these lines through the center-
line on the back wall.
2. Draw lines 5¼" (13.3 cm) to the right and left of the centerline on the
wall. Make sure these lines intersect with the lines you drew in Step 1.
3. With the lines you drew as a guide, use a saber or keyhole saw to cut
a rectangular opening in the wall for the vent.
Cabinet
2
3
" (7.0 cm)
4
6
3
" (17.1 cm)
4
STYLE 2 - CUT OPENINGS FOR TOP VENT OUTLET
(FROM RECTANGULAR TO 6" (15.2 CM) ROUND VENT SYSTEM)
Roof venting
To make a 6½" x 8½" (16.5 cm x 21.6 cm) rectangle in the cabinet
bottom:
1. Draw a line ½" (1.3 cm) from the back wall on the centerline of the
underside of the cabinet, and then draw another line 6½" (16.5 cm)
from the first line.
2. Draw lines 4¼" (10.8 cm) to the right and left of the centerline on the
underside of the cabinet.
3. With the lines you drew as a guide, use a saber or keyhole saw to cut
a rectangular opening for the vent.
Ø 1"
(2.54 cm)
8
English
" (17.1 cm) below
3
4
Centerline
front
5
1
"
5
1
"
4
4
(13.3 cm)
(13.3 cm)
6
1
"
2
7
10
" (19.4 cm)
16
(16.5 cm)
*
"
1
2
(1.3 cm)
1
9
" (4 cm)
16
)
4
1
"
4
4
1
"
4
(10.8 cm)
(10.8 cm)
From wall, not cabinet frame
To make a circular vent opening on the underside of the cabinet top:
1. Draw a centerline on the underside of the top of the cabinet.
2. Draw a line 3
" (9.7 cm) from the back wall on the underside of the
7
8
top of the cabinet. Make sure the line intersects with the line you drew
in Step 1.
3. Where the two lines intersect, use a compass or a circle template to
draw a 6¼" (15.2 cm) circle.
4. With the circle you drew as a guide, use a saber or keyhole saw to
cut the circular vent opening.
Circular vent opening
*3
7
"
8
(9.7 cm)
*From wall, not
cabinet frame
Install vent system
1. Install the vent through the vent opening in the cabinet or wall. Com-
plete the venting system according to the selected venting method.
See the "Venting Requirements" section.
2. Use caulking to seal the exterior wall or roof opening around the cap.

Installing the Range Hood

1. Remove the baffle filters. See the "Range Hood Care" section.
2. Remove the foam shipping pad from behind the blower motor.
3. Lift the range hood up under the cabinet and determine it's final
location by centering it beneath the cabinet. Mark on the underside
of cabinet the location of the 4 keyhole mounting slots on the range
hood. Set the range hood aside on a covered surface.
A
A. Keyhole slot
4. Use a
" (3 mm) drill bit and drill 4 pilot holes as shown.
1
8
A. Drill pilot hole
5. Install the 4 - 4.5 x 13 mm mounting screws in the pilot holes. Leave
about
" (6.4 mm) space between the screw heads and cabinet to
1
4
slide the range hood into place.
6
1
"
4
15.2 cm
Cabinet
cutouts
A
1
(6.4 mm)
4"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nk36n7000usNk30n7000ugNk36n7000ug

Table of Contents