Download Print this page

Wolf CSW Series Installation Instructions

Dhw cylinder connection set for installation on finished walls

Advertisement

Quick Links

Installation instructions

CSW/TSW DHW cylinder
connection set for installation on finished walls
Wolf
GmbH
·
D-84048
Mainburg
·
Postfach
1380
·
Tel.
+49-8751/74-0
·
Fax
+49-8751/741600
Part no. 30 48 457
11/05
GB

Advertisement

loading

Summary of Contents for Wolf CSW Series

  • Page 1: Installation Instructions

    Installation instructions CSW/TSW DHW cylinder connection set for installation on finished walls Wolf GmbH · D-84048 Mainburg · Postfach 1380 · Tel. +49-8751/74-0 · +49-8751/741600 Part no. 30 48 457 11/05...
  • Page 2 CSW / TSW connection set for installation on finished walls Gas fired boiler and DHW cylinder positioning Connection Connection panel panel DHW cylinder cutout for supply lines TSW without decorative panel TSW with decorative panel Connection set ...SW-120 for surface installation Connection Connection panel...
  • Page 3 CSW / TSW connection set for installation on finished walls Connection set installation - Fit the 3/4" pipe connectors for the heating flow on the l.h. side, for the heating return on the r.h. side, using the flat gaskets and union nuts supplied. Wind hemp around the 1/2"...
  • Page 4 CSW / TSW connection set for installation on finished walls Pipework installation Fit the gas connection, primary flow, primary return,P+T-pipe and tundish, DHW and cold water pipes in that order to ensure a trouble-free installation. P+T- pipe Cold water Installation P+T-pipe and tundish and cold water supply according to manual DHW cylinder CSW 120.

This manual is also suitable for:

Csw 120Tsw 120Tsw series