Siemens SINAMICS G120D Getting Started page 66

Control units cu240d-2 and cu250d-2 with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Commissioning
4.2 Commissioning with the IOP
18. Set the Ramp Down time in seconds.
19. A summary of all the settings is display.
20. The final screen gives two options:
The basic commissioning of your converter is finished.
66
This is the time the Inverter/motor system will take from
being given the OFF1 command, for the motor to reach
a standstill.
If the settings are correct, select Continue.
• Save settings
• Cancel Wizard
If save is selected, a factory reset will be performed then
the settings are saved to the Inverter memory. The loca-
tion of safe data is assigned using the "Parameter sav-
ing mode" function in "Parameter settings" in "Menu".
Getting Started, 07/2016, FW V4.7 SP6, A5E38556189B AA
SINAMICS G120D converter

Advertisement

Table of Contents
loading

Table of Contents