ABB PVS-100 Series Hardware Manual page 44

Solar inverters medium voltage compact skid
Hide thumbs Also See for PVS-100 Series:
Table of Contents

Advertisement

44 Electrical installation
4. Drill holes of appropriate sizes in the AC cabinet cover and install cable glands to ensure
that IP protection is established.
Individual cabling (single phase)
5. Route the cables inside the AC cabinet.
6. Connect the cables to the correct fuse base terminals in the AC cabinet. Tighten the
connections.
Note:
You can connect the fuse base without terminating the LV AC cables.
Multicore cabling (3-phase)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents