Remove From, And Return To Service Procedure; Remove From Service; Return To Service - Generac Power Systems G0065510 Owner's Manual

60 hz air-cooled generators
Table of Contents

Advertisement

Maintenance
Remove From, and Return To
Service Procedure

Remove From Service

If the generator cannot be exercised monthly, at a
minimum, and will be out of service longer than 90 days,
proceed as follows to prepare the generator for storage:
1. Start engine and allow it to warm up.
2. Close fuel shutoff valve in the fuel supply line and
allow engine to stop.
3. Once the engine has stopped, set the generator
MLCB (generator disconnect) to OFF (OPEN).
4. Disconnect battery charger AC input T1/Neutral
cable (with white sleeve) at controller.
5. Remove 7.5 A fuse from the generator control
panel.
6. Disconnect battery cables. Remove the negative
cable first.
WARNING
Explosion. Batteries emit explosive gases.
Always disconnect negative battery cable
first to avoid spark. Failure to do so could
result in death or serious injury.
7. Drain oil completely while the engine is still warm,
and then fill crankcase with oil. See
Requirements.
8. Attach a tag to the engine indicating the viscosity
and classification of the new oil in the crankcase.
9. Remove spark plug(s) and spray a fogging agent
into spark plug(s) threaded openings. Install and
tighten spark plug(s) to specification.
10. Remove battery and store in a cool, dry place.
11. Clean and wipe down the generator enclosure.

Return to Service

Proceed as follows to return the unit to service after
storage:
34
1. Check the tag on the engine for oil viscosity and
classification. Drain and fill with proper oil, if
necessary.
2. Check the state of the battery. Fill all cells of
unsealed batteries to the proper level with distilled
water. DO NOT use tap water. Recharge the
battery to 100% state of charge. Replace the
battery if defective.
3. Clean and wipe down the generator enclosure.
4. Verify 7.5 A fuse is removed from generator control
panel.
5. Connect battery. Observe battery polarity. Damage
may occur if the battery is connected incorrectly.
Install positive cable first.
6. Connect battery charger AC input T1/Neutral cable
(with white sleeve) at controller.
7. Open the fuel shutoff valve.
8. Insert 7.5 A fuse into the generator control panel.
(000238)
9. Complete
(diagrammed in the generator installation manual).
Engine Oil
10. Press the MANUAL mode button to start the unit.
Allow the unit to warm up for a few minutes.
11. Press the control panel OFF mode button to stop
the unit.
12. Set the MLCB (generator disconnect) to ON
(CLOSED).
13. Press the AUTO mode button on the control panel.
The generator is ready for service.
NOTE: The exercise timer and current date and time
must be reset if a battery has been completely
discharged or disconnected.
WARNING
Explosion. Batteries emit explosive gases.
Always connect positive battery cable first to
avoid spark. Failure to do so could result in
death or serious injury.
the
Installation
Owner's Manual for 60 Hz Air-Cooled Generators
(000133)
Wizard
procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0065510

Table of Contents