ELECTRICAL WIRING

System 3, System PXL, System SXL-EX, System SXL, MXL/MXL-IQ
Control Panel (CZM-1/1B6 or CZM-4), or CP-2ER – See Figure 6. Use
two wire circuits of 18 AWG, limited energy, shielded cable without conduit,
if permitted by the local building codes.
System XL3 – See Figure 7. Use two wire circuits of 18 AWG, limited energy,
shielded cable without conduit, if permitted by the local building codes.
MXL/MXL-IQ Control Panel – See Figure 8. Use two wire circuits of 18
AWG, limited energy, shielded cable without conduit, if permitted by the lo-
cal building codes.
INSTALLATION OF SMOKE DETECTORS
CAUTION: Air Duct Detector Models AD-3I/3ILP are designed only for
those detectors shown in the Smoke Detector Compatibility
section (See Tables 1 and 2). Do not use any other detector
(See Figure 3, items 14 and 15).
Programming
ILI-1B, ILI-1BH, ILP-1, ILP-2 Detectors
Model AD-3I/3ILP ducts, using ILI-1B, ILI-1BH, ILP-1, or ILP-2 detectors,
can be programmed to respond at a specific and unique system address.
Program each detector using the Model FPI-32 Programmer/Tester. See
the FPI-32 Manual, P/N 315-090077. The ILP-2 requires FPI-32 Rev. 1.3
software or greater.

Installation

Align the detector alarm LED with the LED imprint located within the detec-
tor compartment on the housing. Rotate the detector counterclockwise
while pushing on the detector until it drops in place. Next, push and rotate
clockwise to engage the electrical connections. The detector automatically
stops and locks in place.
Removal
To remove the detector, push on the detector and rotate it counterclockwise
until the stop is reached. Then pull the detector out of the base to disengage.
9