Hobart 6T28-600CL Operation And Maintenance Manual page 46

3-phase solid state transformer-rectifiers
Table of Contents

Advertisement

OM-2244 / Operation and Maintenance Manual
DCS-600/ Series 500082 / Solid State Transformer-Rectifiers
Test Point
Function
TP1
SCR Gate Pulse Phase 3
TP2
SCR Gate Pulse Phase 2
TP3
PC Board Common
TP4
+10.0 VDC Timer Voltage
TP5
+15 V Regulated Voltage
–15 V Regulated Voltage
TP6
TP7
+24 V Unregulated Voltage
TP8
SCR Gate Pulse Phase 1
TP13
Actual Output Voltage (28.5 or 14.25)
TP14
Null at zero output current: provides amplified
load amp reading for comparison with
overload limit (TP20) and starting amperage
limit (TP21) set by R13 control on front panel.
TP15
PC Board Common
TP17
Voltage Slope Test Point
TP19
Reference Volt Test Point
TP20
Overload Limit
TP21
Starting Current
TPD
SCR Gate Timer Output Phase 3
TPE
SCR Gate Timer Output Phase 2
TPF
SCR Gate Timer Output Phase 1
TPL
Overload Trip Summing Point
Table 1 GPU Circuit Board Test Points and Controls
December 15, 2014
Signal Controlled by:
R10
R9
R109 (-28.5 V) or
R110 (-14 V)
R38
R102
R101
R60
R13 (front panel)
Chapter 2-2
Page 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5t28-600cl500082-6 seriesGpu-600 series

Table of Contents