Colour High Volume Production System - Installation Guide
Pro C900
When floor boards are used, install a ramp at the edge of the flooring
to allow the stacker trolley to move in and out of the stacker. At this
stage this is a locally sourced solution.
If Yellow Tongue Flooring is required for the mainframe and options,
please install one sheet of 1200mm x 1500mm x 19mm (D x W x H)
particle board for the rear controller box to open out on too.