Installation

Improper Unit Lift!
Do not lift the unit from top! Lift from lifting lugs only located at bottom of unit. Test lift unit
approximately 24 inches to verify proper center of gravity lift point. To avoid dropping of unit,
reposition lifting point if unit is not level. Failure to properly lift unit could result in death or
serious injury or possible equipment or property-only damage.
Heavy Objects!
Follow good lifting practices before lifting the unit, such as estimating center of gravity and test
lifting the unit to check for balance and stability. Each of the cables (chains or slings) used to lift
the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or
slings) may not be of the same length. Adjust as necessary for even unit lift. Other lifting
arrangements could result in death or serious injury, and equipment or property damage.

Contractors' Responsibilities

Installing Contractor

12
WARNING
WARNING
Unpack the gas heat section and remove the skid.
Remove protective coverings.
Rig and/or move the section to the air handler location. The contractor must provide slings,
spreader bars, clevis hooks, pins, etc. for rigging.
For outdoor gas heat sections, a level roof curb or structural steel support system is required.
If the gas heat section is provided with an external piping vestibule, no support is required for
the vestibule.
For outdoor sections, install the flue stack. The flue must be removed from the airstream before
assembly. Install the flue stack on the gas heat section before assembling the gas heat section
to the air handler.
Clear debris from combustion air inlets located on the side or bottom of the gas heat section.
Remove any debris obstructing combustion air inlets.
In areas where snow drifts are higher than the bottom of the vestibule, a hood or louver may
have to be installed for combustion air.
Assemble the gas heat section to the air-handling system. Refer to the Performance Climate
Changer air handler Installation, Operation, and Maintenance manual, CLCH-SVX07B-EN for
specific assembly instructions. This manual ships inside the supply fan section of the air
handler.
Penetrate the unit casing and connect the supply gas line to the gas train. Gas supply line
connection sizes are shown in
Table
3.