Receiving Inspection; Storage; Outdoor Air Handler Gas Heat Sections; Indoor Air Handler Gas Heat Sections - Trane Gas Heat Sections for Performance Climate Changer Air Handlers Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Receiving Inspection

Upon receipt of the gas heat section, inspect it for damage that may have occurred during
shipment. Report damage immediately to the freight company. Trane is not responsible for
shipping damage.

Storage

Outdoor Air Handler Gas Heat Sections

A gas heat section designed for outdoor use requires no special protection during storage. Select
a solid, well-drained area. Concrete or black top surfaces are recommended. If concrete or black top
is not available, set the section on wood timbers to prevent dirt, mud, snow, etc. from getting into
the unit. Keep access doors closed to prevent damage to gas train components.
If needed, cover with a canvas tarp. Covering the unit with clear or black plastic sheets is not
recommended because this material traps condensed moisture, which can cause equipment
damage resulting from rust and corrosion.
Note: Trane warranty does not cover equipment damage due to negligence during storage.

Indoor Air Handler Gas Heat Sections

For a gas heat section designed for indoor use, Trane recommends indoor storage. If outdoor
storage is necessary, select a solid, well-drained area. Concrete or black top surfaces are
recommended. If concrete or black top is not available, set the unit on wood timbers to prevent dirt,
mud, snow, etc. from getting into the module. Keep access doors closed to prevent damage to gas
train components.
Cover the unit with a canvas tarp. Covering the unit with clear or black plastic sheets is not
recommended because this material traps condensed moisture, which can cause equipment
damage resulting from rust and corrosion.
Note: Trane warranty does not cover equipment damage due to negligence during storage.
CLCH-SVX08A-EN
Inspect the access door latches and hinges for damage.
Open the access door and check for internal, hidden damage. Concealed damage must be
reported within 15 days of receipt.
Locate the hardware kit.
Locate the flue stack if it is an outdoor unit.
If shipped on a skid, do not remove the gas heat section from the skid at this time.
Pre-Installation
11

Advertisement

Table of Contents
loading

Table of Contents