Test Run - Grizzly G0842 Owner's Manual

Wood lathe w/copy attachment
Table of Contents

Advertisement

5.
attach each of (3) copy attachment handwheel
handles to the hub, then tighten pre-installed
jam nuts against hub (see figure 16).
hub
handle
figure 16. Copy attachment handwheel handles
attached to hub.
— If you plan to use the lathe for spindle or
faceplate turning operations, loosen tool
rest base locking bolt, rotate tool rest
so it faces front of lathe, then retighten
bolt (see figure 17). Move copy attach-
ment bracket and handles all the way left
against headstock so they are out of the
way. now, proceed to Test Run.
important: The tool rest is installed back-
wards for shipping purposes and must be
properly repositioned (refer to Page 28)
before starting turning operations.
Copy attachment
Bracket
tool rest
figure 17. tool rest positioned for operations
and copy attachment bracket moved out of way.
— If you plan to use lathe to make spindle
copies, proceed to Test Run and com-
plete all steps, then proceed to Copy
Attachment Operation on Page 24.
Model G0842 (Mfd. Since 04/18)
Jam nut
tool rest Base
locking Bolt

Test Run

once assembly is complete, test run the machine
to ensure it is properly connected to power and
safety components are functioning correctly.
if you find an unusual problem during the test run,
immediately stop the machine, disconnect it from
power, and fix the problem BEForE operating the
machine again. the Troubleshooting table in the
SERviCE section of this manual can help.
the test run consists of verifying the following:
1) the motor powers up and runs correctly, and
2) the safety disabling mechanism on the switch
works correctly.
Serious injury or death can result from
using this machine bEfORE understanding
its controls and related safety information.
DO NOT operate, or allow others to operate,
machine until the information is understood.
DO NOT start machine until all preceding
setup instructions have been performed.
Operating an improperly set up machine
may result in malfunction or unexpect-
ed results that can lead to serious injury,
death, or machine/property damage.
To test run machine:
1.
Clear all setup tools away from machine.
2.
Connect machine to power supply.
-19-

Advertisement

Table of Contents
loading

Table of Contents