q
z
x
e
c
r
v
t
w
y
Inserting the bobbin
z Place the bobbin in the bobbin holder with
the thread running off as illustrated.
q Thread
x Guide the thread into the front notch on
the front side of the bobbin holder. Draw
the thread to the left, sliding it between the
tension spring blades.
w Front notch
e Tension spring blade
c Continue to draw the thread lightly until the
thread slips into the side notch.
r Side notch
v Pull out about 4˝ (10 cm) of thread. Attach
the hook cover plate. Check the threading
by referring to the chart shown on the hook
cover plate.
t Thread
y Hook cover plate
12