Download Print this page

American Standard AUD2B060AFV32A Installer's Manual page 14

Variable speed, 2-stage, 80% upflow/horizontal gas-fired furnaces, fan assisted combustion system with whole house air cleaner

Advertisement

Installer's Guide
FIGURE 12
FIELD WIRING DIAGRAM FOR VARIABLE SPEED 2 STAGE FURNACE
SEE
NOTE 6
SEE
NOTE 10
B/C
14
1 STAGE HEATING
USING A 1 STAGE HEATING THERMOSTAT
1. Be sure power agrees with equipment nameplates.
2. Low voltage (24 volt wiring) to be No. 18 A.W.G. min.
3. Grounding of equipment must comply with local codes.
4. Set thermostat heat anticipator per unit wiring diagram.
5. These leads provide 115V. power for connection of humidifier
MAX. load 1.0 amp.
W14
6. When a single stage heating thermostat without fan switch
is used, no wiring on "G" terminal is used.
7. W1 and W2 must be jumpered together for proper operation.
Second stage heat will begin 10 minutes after first stage.
W14 JUMPER
8. Set dip switches with power off per installation instructions
SEE NOTE 11
to set airflow and indoor fan off delays.
9. Continuous fan airflow can be increased by adding this jumper.
10. This wire is only for thermostats requiring connection to
Y1/Ylo
transformer common terminal.
11. Optional humidistat is to be connected between R and BK. Factory installed jumper R
to BK on the circuit board must be cut if optional humidistat is used. The jumper must
also be cut when applying an airflow command signal to the BK input such as with the
SEE
variable speed single-zone and multi-zone system controllers. On single speed cooling
NOTE 9
only/non-heat pump systems, jumper Y to O for proper operation of the delay profiles
and the humidistat. For two compressor or two speed systems, jumper YLo to O.
FIELD ADDED JUMPER
W1 TO W2.
2ND STAGE WILL FIRE
10 MINUTES AFTER 1ST.
TO 115 V 1 PH.,
60 HZ., POWER
SUPPLY PER
B/C
LOCAL CODES
HUM SEE
NOTE 5
NO COOLING
From Dwg. B342027 Rev. 0
18-CD24D1-2

Advertisement

loading