Commissioning The Application - Siemens SINAMICS G120D Getting Started

Distributed converter, control units with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

4.3

Commissioning the application

Commissioning the applications
The Intelligent Operator Panel (IOP) allows the commissioning of a variety of applications
utilizing a step-by-step wizard that presents the user with the questions relevant to the
application being commissioned. When used in conjunction with the various wiring diagrams
contained within the IOP Operating Instructions, the application can be quickly and easily
commissioned.
Figure 4-2
Example of IOP Wizards and Inverter wiring diagrams
SINAMICS G120D converter with control units CU240D-2 and CU250D-2
Getting Started, 04/12014, FW V4.7, A5E34262374B AA
Commissioning
4.3 Commissioning the application