Cabling the Server

After the cable management arm is installed, cable the server by following
these procedures:
1. Plug all external cables into the server.
2. If you installed a switchbox into the rack, route the CPU-to-switchbox
cables to the switchbox.
3. Bundle all of the cables, including the power cable, and then secure
them to the cable management arm using the tiewraps (supplied).
Figure 2-11. Routing and securing the cables
4. Extend the bundled cables down the rack cable channel.