LG LV-B1864CL Product Data page 63

Ceiling & floor 50hz, r22, ceiling suspended 50hz, r22
Hide thumbs Also See for LV-B1864CL:
Table of Contents

Advertisement

15. Installation
• Secure the unit to the Installation Plates with four M8 bolts and
washers.
• Before working, refer to "Flaring Work"
on page 74
• Fit the projection hooks of the side plates to the 'Side Panel'
• Fasten the screws.
• Hook up the Inlet Grille Hook to the cabinet.
Inlet hanger
• Hang the Inlet Hanger to the screw.
Hook
Cabinet Bottom
62
Ceiling & Floor, Ceiling Suspended (50Hz, R22)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents