Siemens AD1-C11 Quick Manual

Siemens AD1-C11 Quick Manual

Air sampling smoke detection system

Advertisement

Quick Links

Air sampling smoke detection system
AD1-C11
Quick Guide for Commissioning
1
Installation
§ Connect power (24VDC)
§ Connect the detector line
§ Connect reset input (if S1 = ON)
§ Install the detector base and the smoke detector
§ Connect pipe system or test pipe
2
Set Up
Set DIP switches S1 and S2 on pcb E573 according to tables below:
Air flow monitoring
switch S2
delay time
A
B
OFF
ON
short
ON
OFF
middle
ON
ON
long
OFF
OFF
very
long
Fault
switch S1
OFF
Fault not latching
ON
Fault latching until reset
3
Commissioning
Adjustment of the Air Flow Sensor
1.
Fix cover and tighten screws
2.
The unit must be in operation for at least 5 minutes
3.
Adjustment with adjusting peg to
0V +- 15 mV
4.
Unit ready
switch S2
C
30 s
ON
2 min. (standard)
OFF
16 min.
OFF
128 min.
(standard)
Fire & Security Products
range
D
OFF
small
I
ON
middle
II
OFF
large
III
or according to the air pressure adjustment
chart
Siemens Building Technologies Group
(standard)

Advertisement

loading

Summary of Contents for Siemens AD1-C11

  • Page 1 Fix cover and tighten screws The unit must be in operation for at least 5 minutes Adjustment with adjusting peg to or according to the air pressure adjustment 0V +- 15 mV chart Unit ready Fire & Security Products Siemens Building Technologies Group...
  • Page 2 +24V 24 VDC +24V Rückstellen Reset + Reset - Reset AD1-C11 Siemens Building Technologies AG Alte Landstrasse 411 CH-8708 Männedorf Tel. +41 1 - 922 61 11 Fax +41 1 - 922 64 50 www.cerberus.ch Document no. e4083b Manual - Edition 07.2001...