Kohler PowerWAVE 9500DPA User Manual page 52

(100–500 kva/kw) parallelable up to 3 mva/mw
Table of Contents

Advertisement

:
44
Figure 4.11 Separate battery cable installation and connection
Bottom cable entry
Shows bottom-entry power busbars and the
routing for the separate battery cables which are
connected to the battery fuses (f3).
Top cable entry
Shows top-entry power busbars and the routing
for the separate battery cables which are
connected to the battery fuses (f3).
TS_622_02 PowerWAVE 9500DPA User Manual 26/2/19

Advertisement

Table of Contents
loading

Table of Contents